Keep thismanual onboard !For thrusters: SP155TC / SP200TC / SP220TCSeries / paralell switch boxinstallation manualIMPORTANT NOTICE:This manual is to
2Series / paralell switch box intallation manual 1.0 - 2002Installation of the Sidepower series / paralell switch boxNote! To achieve maximum effe
3Series / paralell switch box intallation manual 1.0 - 2002The switch box works like thisWhen the thruster is not running: (see FIG.1)The two batt
4Series / paralell switch box intallation manual 1.0 - 2002Series / paralell switch box installationInstallation1. Install the thruster as per the
5Series / paralell switch box intallation manual 1.0 - 2002Visual wiring diagramA1RedRedBlueGreySLEIPNERSIDEPOWERTHRUSTEROFFONONBlackControl cable
6Series / paralell switch box intallation manual 1.0 - 2002Technical wiringTo controlpanel(s)C4C3A1A2SIDE-POWERM24 VDCBatt. 1(12V)-+12VK2K1CoElect
7Series / paralell switch box intallation manual 1.0 - 2002Technical drawingsExistingREDExistingGREYNew GREY fromser/par boxExistingREDExistingBLU
Service CentresSleipner Motor AS, P. O. Box 519, N-1612 Fredrikstad, NorwayTel: +47 69 30 00 60 Fax: +47 69 30 00 70 [email protected]
Comentários a estes Manuais